MES: Shop Floor
The line tablet where work is started, checked and finished, and the loss is measured.
Learn morePlan it, issue it, make it and cost it, with the bill of materials the design team released.
Bills of materials, routings and work centres feed production and work orders. Material planning tells you what to buy; the production cost flows into stock valuation.

What is inside
Multi-level BOMs with lifecycle and approved substitutes.
Operations, setup and run times, calendars.
Issue, report, scrap and close with variance.
Net requirements by item, with rules for lead time and safety stock.
Send material to a job-worker and receive finished goods back.
Record scrap and reverse a build with an audit trail.
Preventive maintenance by date or meter reading; MTBF.
A sales line carries its configuration into a production order.
Pay by output for karigars and job-workers.
Made items are costed from production orders into stock value.
Part of the recommended set for: Food and Snacks, Ayurveda and AYUSH, Plastics and Packaging, Discrete Manufacturing, Process Manufacturing.
We list gaps on purpose. If one matters to you, tell us in your inquiry.
The line tablet where work is started, checked and finished, and the loss is measured.
Learn moreCatch it at receipt, on the line and before dispatch, and prove it to the auditor.
Learn moreOne engineering bill of materials, controlled change and the CAD that belongs to it.
Learn moreBuild the whole shortlist, then send one inquiry. We reply within one working day.