Manufacturing
Plan it, issue it, make it and cost it, with the bill of materials the design team released.
Learn moreThe line tablet where work is started, checked and finished, and the loss is measured.
Operators sign in at a station, see the work instruction for the revision in force and report what they made. OEE and downtime come from what was actually reported.

What is inside
A tablet view for each line: queue, start, pause, finish and report.
Revisioned instructions with critical-to-quality checks; the operator acknowledges before starting.
Availability, performance and quality, with downtime reasons.
Sequence jobs with changeover rules to cut set-up time.
Balance a line against takt time.
Link the plan to material requirements.
Part of the recommended set for: Discrete Manufacturing.
We list gaps on purpose. If one matters to you, tell us in your inquiry.
Plan it, issue it, make it and cost it, with the bill of materials the design team released.
Learn moreCatch it at receipt, on the line and before dispatch, and prove it to the auditor.
Learn moreOne engineering bill of materials, controlled change and the CAD that belongs to it.
Learn moreBuild the whole shortlist, then send one inquiry. We reply within one working day.