MES: Shop Floor
The line tablet where work is started, checked and finished, and the loss is measured.
Learn moreCatch it at receipt, on the line and before dispatch, and prove it to the auditor.
Control plans define what to check; inspection lots apply sampling plans; nonconformances run through corrective and preventive action. Statistical charts show drift before it becomes scrap.

What is inside
What is measured, how, how often and against which limits.
Incoming, in-process and final, with AQL sampling.
Raise, contain, find root cause, correct, verify and close.
Control charts with Cp and Cpk.
Register, schedule and record calibration.
Gage R&R studies, switched on when you need them.
Incoming rejection rates rolled up by supplier.
Scrap, rework and returns priced.
QC sign-off before a batch can ship.
Part of the recommended set for: Food and Snacks, Ayurveda and AYUSH, Plastics and Packaging, Discrete Manufacturing, Process Manufacturing, Pharma and Life Sciences.
We list gaps on purpose. If one matters to you, tell us in your inquiry.
The line tablet where work is started, checked and finished, and the loss is measured.
Learn morePlan it, issue it, make it and cost it, with the bill of materials the design team released.
Learn moreEvery obligation, certificate and audit in one calendar, with the evidence attached.
Learn moreBuild the whole shortlist, then send one inquiry. We reply within one working day.